ODOT weekly project update

0

PREBLE COUNTY — The Ohio Department of Transportation has issued its weekly construction update for the week ending June 1.

The following traffic advisory includes restrictions on the state highway system in Preble County. All work will be contingent upon the weather. For construction information and statewide information regarding road conditions, visit ODOT on the web at www.Ohgo.com.

U.S. 35/Interstate 70 bridge rehabilitation — At the ramp on U.S. 35 West over I-70. Height restrictions are in effect on I-70 at the overpass, with15’8” on I-70 East and 16’4” on I-70 West.

U.S. 127/I-70 bridge rehabilitation — At the structure on U.S. 127 over I-70. The eastbound exit ramp from I-70 to U.S. 127 is closed through early June (June 9) for reconstruction, and traffic will be detoured via I-70 East and the Ohio 503 interchange to I-70 West and U.S. 127. Intermittent lane restrictions may also be in effect on I-70 in either direction.

Ohio 121 bridge rehabilitation — Between Freed Road and Water Street at New Paris. S.R. 121 will be closed for up to 60 days beginning June 4, and while the route is closed, motorists will be detoured via Ohio 320 and U.S. 40 to Gravel Pit Road and Indiana 121 in Indiana.

Ohio 122 resurfacing — Between Wolverton Road and the western corporation limit of Eaton. Ohio 122 will be closed in both directions between Wolverton and Daily roads, and the restrictions in this section are anticipated to be in effect through early June. This will then be followed by a two-month closure between Daily and Toby roads, from approximately June 4 through Aug. 3, and then a two-month closure between Toby Road and the city of Eaton, from approximately Aug. 3 through early October. Throughout construction within any of the closed segments, traffic will be detoured via U.S. 127, Ohio 725 and Ohio 177, Indiana 227 and Old 122 in Indiana.

U.S. 35 bridge rehabilitation — At the ramp that carries U.S. 35 West traffic over I-70. The ramp is closed for up to 150 days, through mid-August, and while it is closed, motorists will be detoured via Ohio 320 and U.S. 40. Intermittent lane and shoulder restrictions will also be in effect on I-70 East and West through the work zone. The project is scheduled to be completed in the fall of 2024.

U.S. 35 culvert replacement/resurfacing — Between Ohio 320 and Lexington Road at Eaton. Traffic will be maintained with the use of flaggers and/or barrels or cones. Traffic will also be maintained with temporary signals between Eaton New Hope and Washington Jackson roads for culvert work. The entire project is scheduled to be completed in November 2024.

North Maple Street (Eaton) minor widening/sidewalk installation — Between Mechanic Street and Lexington Road in the city of Eaton. Construction includes the installation of curb, gutter, and storm sewer and replacement or addition of sidewalk on both sides of the street. Maple Street will be closed, with northbound motorists will be detoured by way of Edison Street, Barron Street and Lexington Road. Southbound motorists will follow Lexington and Barron to Monfort Street. Traffic will be maintained for residents, businesses, and emergency personnel. The entire project is scheduled to be completed in late fall 2024.

Ohio 121 bridge rehabilitation — Between Melody Lane and H&W Road, just north of New Paris. Traffic will be maintained in one lane with the use of temporary signals, and the entire project is scheduled to be completed this fall.

U.S. 127 bridge rehabilitation — At the structure over I-70. U.S. 127 is reduced to one lane in each direction, with traffic being maintained through the work zone. The westbound exit ramp from I-70 to U.S. 127 is closed through mid-May for reconstruction, and traffic is being detoured via I-70 West and U.S. 40 East. Intermittent, single-lane closures may be in effect on I-70 under the bridge as well. All work will be completed in August.

No posts to display